Home
Finding the Church
Audio Archive
Recent Events
Building in Faith
Mission Partners
Calendar of Events
Teen's Team for Christ
The Messenger Newsletter
Our Staff & Leaders
GPUCC History
Church Funnies
Related Sites

Plans and Images of the 
Proposed Building Addition 
 

Worship Schedule
8:15-9:00 Early Worship
9:15-10:10 Praise Worship
(9:15 Sunday School)
10:30  Worship

Nursery Care from 9:10-11:40

 

Plans and Images of the 
Proposed Building Addition 
 

Detailed Floor Plan of 
renovated and new areas
(PDF Document)

 

February 26, 2006

Roofing is partially complete - about 1/4 of the shingles are installed. Brick has arrived so the masons can get started while the heating work inside continues. Window and door frames have been installed, giving additional appearance of final form.


You can see the window frames and the door frame has been installed in the narthex wall. 
The door frame is the familiar arched-top doorway that was installed by the old pastor's study.
The doors are inside, ready for installation. 


This is the south wall, facing the Annex (Office, Youth Area) and the door frame and 
window frames are installed here, too.


The view from the southwest shows the south slope has its tar paper in place, ready for shingles.
Below you can see the 1/2 of the north slope is shingled and the starter strip installed on the other half.

 


From the alley, you see not only the covered roof, ready for shingles, but the
gable end wall has been built and covered with Tyvek© housewrap.


This is the confluence of several roofs. The slope to the right is the sanctuary. The
flat area with the air conditioner is the old pastor's study. the rest is the new flat roof
area of the addition - the Narthex and the corridor behind the sanctuary.
in the lower left you can also see the sloped roof of the addition. The shadow in the
middle is the dormer on the northside of the addition's roof. The answer to the mystery -
it's an access door to the roof.


This is a stairway to the attic area over the new addition and the Sunday School wing. It is located over the stairs that come from the basement, behind the stage. It will be used only for storage. 
The left photo below is the attic area over the addition, while
the right photo is the attic area over the existing Sunday School wing.
 


Insulation has been installed in the ceiling of the addition, below the attic floor,
to assure we keep our utilities as low as we can.

  
The brick is on-site now - it's going to take a lot of it. As you can see on the right, it has the irregular qualities that has become associated with the building with the existing brick.


The stairs at the annex weren't planned to be replaced
until after all the construction was completed. However,
the condition of them deteriorated so much that they were dangerous.
They have become and emergency project and are ready to pour.