Home
Finding the Church
Audio Archive
Recent Events
Building in Faith
Mission Partners
Calendar of Events
Teen's Team for Christ
The Messenger Newsletter
Our Staff & Leaders
GPUCC History
Church Funnies
Related Sites

Plans and Images of the 
Proposed Building Addition 
 

Worship Schedule
8:15-9:00 Early Worship
9:15-10:10 Praise Worship
(9:15 Sunday School)
10:30  Worship

Nursery Care from 9:10-11:40

 

Plans and Images of the 
Proposed Building Addition 
 

Detailed Floor Plan of 
renovated and new areas
(PDF Document)

 

March 12, 2006

Because of the rain, not much has been accomplished in the last few days. Roofing materials have arrived for the flat roof, as you can see below, but can't be installed until the rain stops.


You can see the water standing on the concrete floor in the narthex addition,
with the wall and lights reflecting in the water. Below you can also see water,
but in addition, the doorway between the existing Sunday School wing and the addition.
These are the former doors to the outside. The doors have been removed and the plywood
installed for security.


The exterior door on the south side of Sunday School wing will be moved into the building a short distance. The new doorframe is setting in place (but not ready to lean against).


The main electrical service panel for the addition will be located in the basement, behind the stage.
Above is the panel, on-site but not installed. Below are two views of the entry points for the main service lines. Core drillings have been made at the Southeast corner of the building into the area behind the stage.
The drillings were made after the brick was installed and the material has been left in the holes on the outside.