Plans and Images of the
Proposed Building Addition Detailed
Floor Plan of
renovated and new areas
(PDF Document) |

March 12, 2006
Because of the rain, not much
has been accomplished in the last few days. Roofing materials have arrived
for the flat roof, as you can see below, but can't be installed until the
rain stops.

You can see the water standing on the concrete floor in the narthex
addition,
with the wall and lights reflecting in the water. Below you can also see
water,
but in addition, the doorway between the existing Sunday School wing and
the addition.
These are the former doors to the outside. The doors have been removed and
the plywood
installed for security.

The exterior door on the south side of Sunday School wing will be moved
into the building a short distance. The new doorframe is setting in place
(but not ready to lean against).

The main electrical service panel for the addition will be located in the
basement, behind the stage.
Above is the panel, on-site but not installed. Below are two views of the
entry points for the main service lines. Core drillings have been made at
the Southeast corner of the building into the area behind the stage.
The drillings were made after the brick was installed and the material has
been left in the holes on the outside.
|