April 12, 2006
The work is moving closer to the last stretch. The
final areas of the roof are being completed. The scaffolding is done and
the soil is being graded. Walls are painted, the ceilings are progressing.

The scaffolding is down and the exterior walls are all complete.

The forms were being set today at lunchtime and were scheduled to be
poured late afternoon.

The upper brick and the limestone capstone is completed on the front of
the Narthex

This is the backside of the facade over the entry and a better view of the
limestone capstone.

The roofing over the west vestibule and over the stairs by the alley
and being completed,
the last areas to be done.


The bathroom fixtures are being installed. This is the new men's room and
the stalls are complete. The toilets are also installed behind them. Above
you can see the sinks being connected. The ladies room isn't quite as
complete, but not far behin.


The ceiling grids are in and the lights have been laid in place.

The older classrooms also have their paint and ceiling grids.

The narthex is still receiving its ceiling grid, but it is nearly
complete.

The electrical conduit in the basement is being hidden behind a new
drywall bulkhead.

The main electrical box is now wired up with gigantic power wires, plus a
new red box has appeared -
the control box for our new fire alarm system.

The soil outside is being graded to clean up the site and get ready for
grass seed.
|