April 14, 2006

How's this for a welcome sight? The bus back at the accessibility entrance
to unload!
Unfortunately a problem has been found. Notice how low the bus is compared
to the concrete?
The floor of the bus and the exit is too far below the concrete level.
Some alterations will
likely need to be made to the area to get everything "on the
level."
The railing is all installed on the ramp and deck area, too.


The entry steps are all poured as well. Notice that the concrete walk has
also been replaced.
No more mud and plywood!

The "small" details are being worked on, giving more appearance
of near final completion.
The gutters have been installed. This gutter is over the narthex area.
Below the limestone capstone is being reinstalled on the edge of the newly
replaced roof along the alley,
over the hallway and stairs to Fellowship Hall.


This is the view from the vestibule at the top of the winding stairs
entry
(formerly called the Narthex), looking to the new narthex. On the left is
the doorway into the sanctuary.
Some may know this as "Tony Basso's Station."

The sinks are now installed in the cabinetry in the classroom,
while the water fountains are also in place in the Narthex.
.

A water heater is also installed now, in a closet in one of the new
classrooms.
|