April 27, 2006
The details being competed now are so small in scale, that updated photos
are difficult to capture. Final coats of paint were being applied to the
walls. Cooling systems are being connected, the fire alarm is installed.

The old canopy for loading/unloading the bus is installed in place.

Refrigerant lines are being installed to connect the air conditioning
lines to the new units.

The hallway from the sanctuary to the Sanctuary to the Sunday School wing
is receiving a new ceiling since a ventilation line now runs along the
ceiling.

The original Sunday School hall gets another coat of paint. The old
rainbow paint is well covered now.

One of the old classrooms is nearly complete with new paint, carpet and