May 3, 2006
Inside everything is basically done! A few small details remain, like
refinishing the doors in the old narthex and HVAC tuning, but contractors
were cleaning up inside the building on Wednesday. Outside, a few projects
also remain, but many are being finished up right now. The drive area
still needs to be completed and railings installed for the new
stairs.

The narthex is done and all cleaned up!

The nursery is also done and ready to move in cribs and toys.

The sidewalk out front had sections replaced with new concrete
Wednesday.

Another curb was poured by the Annex to prepare for the new
driveway.

Some more concrete was poured on the accessibility ramp in order to make
corrections for the grade height so the bus will be at the correct height
for unloading.

The front steps also received an additional layer of concrete to adjust
their depth and location of the landing.
A worker grinding the edges to smooth them.
|