January 18, 2006

The concrete slab is poured - we have a floor. Now the walls will begin to be built. Workers were laying out the placement of the interior walls and the steel stud are on-site. Work remodeling the existing Sunday School wing continues at a swift pace. New doorways have been created and old doorways have been blocked up. The new room dimensions are now in place for the most part.



The new south wall is being constructed with steel studs, beginning to give shape to the addition. As you can see the snow may be slowing them some. 


Plenty of steel studs are piled around for the new walls. Not much has changed yet at the north end, but you can see the progress at the south end. 

The update of the site photo shows that in addition to the south exterior wall construction, utility service trenches are also being dug for new lines.